NRM2 work sections: the complete list

Published on 15 July 2026

In short: NRM2 sorts building work into 41 numbered work sections, running from Preliminaries (section 1) to builder's work in connection with the services (section 41), roughly in the order a building goes up. Measuring and ordering a Bill of Quantities to those sections is what makes it readable and lets tenders be compared like for like. Here is the full list.

What a work section is

A work section is a grouping of related work that NRM2 gives its own measurement rules, units and required description content. It is published in Part 3 of NRM2, the tabulated rules of measurement. When you compile a Bill of Quantities, each measured item sits in one of these sections, which is what keeps a bill from one quantity surveyor readable by any other.

The 41 NRM2 work sections

  1. Preliminaries
  2. Off-site manufactured materials, components and buildings
  3. Demolitions
  4. Alterations, repairs and conservation
  5. Excavating and filling
  6. Ground remediation and soil stabilisation
  7. Piling
  8. Underpinning
  9. Diaphragm walls and embedded retaining walls
  10. Crib walls, gabions and reinforced earth
  11. In-situ concrete works
  12. Precast/composite concrete
  13. Precast concrete
  14. Masonry
  15. Structural metalwork
  16. Carpentry
  17. Sheet roof coverings
  18. Tile and slate roof and wall coverings
  19. Waterproofing
  20. Proprietary linings and partitions
  21. Cladding and covering
  22. General joinery
  23. Windows, screens and lights
  24. Doors, shutters and hatches
  25. Stairs, walkways and balustrades
  26. Metalwork
  27. Glazing
  28. Floor, wall, ceiling and roof finishings
  29. Decoration
  30. Suspended ceilings
  31. Insulation, fire stopping and fire protection
  32. Furniture, fittings and equipment
  33. Drainage above ground
  34. Drainage below ground
  35. Site works
  36. Fencing
  37. Soft landscaping
  38. Mechanical services
  39. Electrical services
  40. Transportation
  41. Builder's work in connection with mechanical, electrical and transportation installations

How the sections group

You do not have to memorise all 41. They fall into a handful of natural families, and they broadly follow the sequence a building is put up in:

Why the order matters

Keeping to the NRM2 section order is what makes a bill navigable. A contractor pricing it, or a QS valuing a variation later, can go straight to the right section without reading the whole document. It also keeps coding consistent, so section totals roll up cleanly into the summary. For the wider method, see how to produce an NRM2 Bill of Quantities, or how NRM2 differs from SMM7, whose lettered sections (A to Y) these numbered ones replaced.

Measuring to NRM2 sections in Kestrel

Kestrel is built by a working UK estimating firm and exports takeoffs as an NRM2 Bill of Quantities in Excel, with items grouped by work section and the codes, descriptions, units and live formulas already in place, so the section order is handled for you rather than sorted by hand. It runs on Windows with a 14-day free trial. Download Kestrel to try it on your next bill.